English
Komatsu PC27MR-2, PC30MR-2, PC35MR-2, PC40MR-2, PC50MR-2 midi excavator pdf shop manual
KOMATSU-SEBM032411
$25.90
No tax
Format: PDF
Pages: 630
File size: 29.19 MB
Language: English
Models: PC27MR-2 15001 and up, PC30MR-2 20001 and up, PC35MR-2 5001 and up, PC40MR-2 8001 and up, PC50MR-2 5001 and up
Create an account and join to our cumulative discounts program. Spend at least $29.9 and get 10.00% discount.
Rating:
(0)
Table of Contents for KOMATSU-SEBM032411 manual
- COVER
- CONTENTS
- 01 GENERAL
- SPECIFICATION DIMENSION DRAWING
- WORKING RANGE DRAWING
- SPECIFICATIONS
- WEIGHT TABLE
- LUBRICANTS, FUEL AND COOLANT SPECIFICATIONS
- 10 STRUCTURE, FUNCTION AND MAINTENANCE STANDARD
- PTO
- COOLING SYSTEM
- POWER TRAIN
- SWING CIRCLE
- SWING MACHINERY
- TRACK FRAME
- IDLER CUSHION
- IDLER
- TRACK ROLLER
- CARRIER ROLLER
- SPROCKET
- TRACK SHOE
- HYDRAULIC COMPONENTS LAYOUT DRAWING
- HYDRAULIC TANK
- CENTER SWIVEL JOINT
- TRAVEL MOTOR
- HYDRAULIC CYLINDER
- SOLENOID VALVE
- MULTI-CONTROL VALVE
- HYDRAULIC PUMP
- CONTROL VALVE
- CLSS
- OPERATION FOR EACH FUNCTION AND VALVE
- SWING MOTOR
- PPC VALVE
- WORK EQUIPMENT
- DIMENSIONS OF EACH PART OF WORK EQUIPMENT
- FLOOR
- AIR CONDITIONER
- ENGINE CONTROL
- ELECTRIC CONTROL SYSTEM
- COMPONENT PARTS OF SYSTEM
- MONITOR SYSTEM
- MONITOR PANEL
- SENSORS
- 20 TESTING AND ADJUSTING
- STANDARD VALUE TABLE FOR ENGINE RELATED PARTS
- STANDARD VALUE TABLE FOR CHASSIS RELATED PARTS
- TESTING AND ADJUSTING
- TROUBLESHOOTING
- 30 DISASSEMBLY AND ASSEMBLY
- HOW TO READ THIS MANUAL
- PRECAUTIONS WHEN PERFORMING OPERATION
- SPECIAL TOOL LIST
- SKETCHES OF SPECIAL TOOLS
- REMOVAL AND INSTALLATION OF FUEL INJECTION PUMP ASSEMBLY
- REMOVAL AND INSTALLATION OF RADIATOR AND HYDRAULIC OIL COOLER ASSEMBLY
- REMOVAL AND INSTALLATION OF ENGINE AND HYDRAULIC PUMP ASSEMBLY
- REMOVAL AND INSTALLATION OF TRACK SHOE ASSEMBLY
- DISASSEMBLY AND ASSEMBLY OF IDLER ASSEMBLY
- DISASSEMBLY AND ASSEMBLY OF RECOIL SPRING ASSEMBLY
- DISASSEMBLY AND ASSEMBLY OF TRACK ROLLER ASSEMBLY
- DISASSEMBLY AND ASSEMBLY OF CARRIER ROLLER ASSEMBLY
- REMOVAL AND INSTALLATION OF CENTER SWIVEL JOINT ASSEMBLY
- DISASSEMBLY AND ASSEMBLY OF CENTER SWIVEL JOINT ASSEMBLY
- REMOVAL AND INSTALLATION OF FLOOR FRAME ASSEMBLY
- REMOVAL AND INSTALLATION OF SWING MOTOR AND SWING MACHINERY ASSEMBLY
- DISASSEMBLY AND ASSEMBLY OF SWING MOTOR AND SWING MACHINERY ASSEMBLY
- REMOVAL AND INSTALLATION OF WORK EQUIPMENT ASSEMBLY
- REMOVAL AND INSTALLATION OF REVOLVING FRAME ASSEMBLY
- REMOVAL AND INSTALLATION OF SWING CIRCLE ASSEMBLY
- DISASSEMBLY AND ASSEMBLY OF CONTROL VALVE ASSEMBLY
- DISASSEMBLY AND ASSEMBLY OF HYDRAULIC CYLINDER ASSEMBLY
- REMOVAL AND INSTALLATION OF AIR CONDITIONER UNIT ASSEMBLY
- REMOVAL AND INSTALLATION OF OPERATOR'S CAB GLASS (STUCK GLASS)
- REMOVAL AND INSTALLATION OF FRONT WINDOW ASSEMBLY
- 90 OTHERS
- HYDRAULIC CIRCUIT DIAGRAM PC27MR-2
- HYDRAULIC CIRCUIT DIAGRAM PC30MR-2
- HYDRAULIC CIRCUIT DIAGRAM PC35MR-2
- HYDRAULIC CIRCUIT DIAGRAM PC40MR, 50MR-2
- HYDRAULIC CIRCUIT DIAGRAM PC40MR, 50MR-2 (ADDITIONAL ATTACHMENT CIRCUIT)
- ELECTRICAL CIRCUIT DIAGRAM PC27MR, 30MR-2 (1/2)
- ELECTRICAL CIRCUIT DIAGRAM PC27MR, 30MR-2 (2/2)
- ELECTRICAL CIRCUIT DIAGRAM PC35MR-2 (1/2)
- ELECTRICAL CIRCUIT DIAGRAM PC35MR-2 (2/2)
- ELECTRICAL CIRCUIT DIAGRAM PC40MR, 50MR-2 (1/2)
- ELECTRICAL CIRCUIT DIAGRAM PC40MR, 50MR-2 (2/2)