English
New Holland E20.2SR, E22.2SR, E27.2SR mini excavator workshop manual
NH-60413401
$35.90
No tax
Format: PDF
Pages: 768
File size: 34,50 MB
Workshop manual for New Holland E20.2SR, E22.2SR, E27.2SR is available for instant download after purchase at any time. Can be downloaded and viewed on any device. Download free preview PDF file using link in Attachments TAB
Create an account and join to our cumulative discounts program. Spend at least $29.9 and get 10.00% discount.
Rating:
(0)
Table of Contents for NH-60413401 manual
- SAFETY PRECAUTIONS
- GENERAL SAFETY INFORMATION
- SAFETY PRECAUTIONS
- 1. OUTLINE
- 1.1 GENERAL PRECAUTIONS FOR REPAIRS
- 1.2 INTERNATIONAL UNIT CONVERSION SYSTEM (Based on MARKS' STANDARD HANDBOOK FOR MECHANICAL ENGINEERS)
- Table 1-1
- Table 1-2
- Table 1-3
- Table 1-4
- Table 1-5
- Table 1-6
- 2. SPECIFICATIONS
- 2.1 COMPONENTS NAME
- 2.2 MACHINE DIMENSIONS
- 2.3 SPECIFICATIONS AND PERFORMANCE
- 2.4 MACHINE & COMPONENTS WEIGHT (DRY)
- 2.5 TRANSPORTATION
- 2.6 TYPE OF CRAWLER SHOES
- 2.7 TYPE OF BUCKET
- 2.8 ENGINE SPECIFICATIONS
- 3. ATTACHMENT DIMENSIONS
- 3.1 BOOM
- Fig. 3-1 Boom Dimensional Drawings
- Table 3-1
- Fig. 3-2 Clearance of pin and bushing on boom section
- Table 3-2
- Table 3-3
- Fig. 3-3 Clearance in thrust direction on boom section
- Table 3-4
- Table 3-5
- Fig. 3-4 Dipper dimensional drawings
- Table 3-6
- Fig. 3-5 Clearance of pin and bushing on dipper section
- Table 3-7
- Table 3-8
- Fig. 3-6 Clearance in thrust direction on dipper section
- Table 3-9
- Table 3-10
- Fig. 3-7 Bucket dimensional drawings
- Table 3-11
- Fig. 3-8 Dimension of lug section
- Table 3-12
- Fig. 3-10 Dozer dimensional drawings
- Table 3-14
- Fig. 3-15 Dozer maintenance standards
- Table 3-15
- Table 3-17
- Table 3-18
- Fig. 3-12 Swing bracket dimensional drawings
- Table 3-19
- Fig. 3-13 Clearance of pin and bushing on swing portion
- Table 3-20
- Fig. 3-14 Clearance in thrust direction on swing portion
- Table 3-21
- 11. TOOLS
- 11.1 TORQUE SPECIFICATIONS FOR CAPSCREWS & NUTS
- 11.2 SCREW AND TOOL SIZES
- 11.3 TORQUE SPECIFICATIONS FOR JOINTS AND HOSES
- 11.4 TORQUE SPECIFICATIONS FOR SLEEVE TYPE TUBE FITTINGS
- 11.5 SPECIAL SPANNERS FOR TUBES
- 11.6 APPLICATION OF SCREW LOCKING AND SEALING COMPOUNDS
- 11.7 COUNTERWEIGHT LIFTING JIG
- Fig. 11-1 Counterweight lifting jig
- 12. STANDARD MAINTENANCE TIME TABLE
- PREFACE
- 12.1 STANDARD WORKING TIME TABLE FOR THE MAINTENANCE OF EXCAVATOR
- 13. MAINTENANCE STANDARDS AND TEST PROCEDURES
- 13.1 HOW TO USE MAINTENANCE STANDARDS AND PRECAUTIONS
- 13.2 PERFORMANCE INSPECTION STANDARD TABLE
- 13.3 MEASURING ENGINE SPEED
- Fig. 13-1 Engine Speed measurement (The above figure shows concept)
- WATER TEMP
- Fig. 13-2 Accelerator wire adjustment
- Fig. 13-3 Main hydraulic oil pressure measurement
- Fig. 13-4 Main hydraulic oil pressure measurement
- Fig. 13-5 Relief valve
- Fig. 13-6 Relief valve (Slewing motor)
- Fig. 13-7 Pilot oil pressure measurement
- Fig. 13-8 Relief valve
- 22. HYDRAULIC SYSTEM
- 22.1 SUMMARY
- 22.2 HYDRAULIC CIRCUITS AND COMPONENT MODELS
- 22.3 HYDRAULIC CIRCUIT OPERATION
- 22.4 SCHEMATIC PIPING FOR HYDRAULIC SYSTEM
- 23. ELECTRICAL SYSTEM
- 23.1 HOW TO READ CIRCUIT DIAGRAM AND HARNESS CONNECTION
- 23.2 ELECTRICAL EQUIPMENT & HARNESS
- Fig. 23-1 Upper Frame Portion (1/6)
- Fig. 23-2 Upper Frame Portion (2/6)
- Fig. 23-3 Upper Frame Portion (3/6)
- Fig. 23-4 Upper Frame Portion (4/6)
- Fig. 23-5 Upper Frame Portion (5/6)
- Fig. 23-6 Upper Frame Portion (6/6)
- Fig. 23-7 Engine Portion (1/3)
- Fig. 23-8 Engine Portion (2/3)
- Fig. 23-9 Engine Portion (3/3)
- Fig. 23-11 Relay Unit Portion (2/2)
- Fig. 23-12 Fuel Tank Portion (1/2)
- Fig. 23-13 Fuel Tank Portion (2/2)
- Fig. 23-13 Socket and Hour meter Assembly
- Fig. 23-14 Cab Portion (OPT) (1/2)
- 24. COMPONENTS SYSTEM
- 24.1 HYDRAULIC COMPONENTS
- 24.1.1 HYDRAULIC PUMP
- 2. SPECIFICATIONS
- 2. Operation
- 2. Swash plate (Hanger)
- 3. Rotary group
- 4. Control spring
- 5. Cover
- 6. Gear pump
- 7. Housing
- 8. Trochoid pump
- 2. Specifications
- 3. Performance Characteristics
- 2. Dumping mechanism
- 2. Component Parts The control valve is roughly classified into the following four sections.
- 2. Pilot operating section
- 3. Manual operation section
- 4. Flow conflux function
- 5. Independent travel function
- 6. Function of Lock Valve
- 7. Operation of relief valve
- 2. Parking brake
- 3. The hydraulic timer is provided to protect the parking brake from dragging and plays to secure delay time so that the parking...
- 4. Operating principle of relief valve
- 5. Make-up valve (check valve, No.54)
- 6. Reduction Unit (2-stage planetary)
- 2. Hydraulic circuit
- 2. Arm cylinder
- 3. Bucket cylinder
- 4. Swing cylinder
- 5. Dozer cylinder
- 2. Function of each Parts
- 24.2 ELECTRICAL EQUIPMENT
- 24.2.1 ELECTRICAL EQUIPMENT LIST
- 24.2.2 SPECIFICATIONS ELECTRICAL EQUIPMENT
- E20_22_27.2SR_2.pdf
- 2. Crawler
- 3. Upper roller (E27.2SR ONLY)
- 4. Lower roller
- 5. Front idler
- 6. Idler adjuster
- 7. Sprocket
- 8. Travel motor
- 9. Slewing bearing
- B. Link height
- C. Height of shoe lug
- D. Bushing O.D.
- E. Interference of bushing and link
- F. Interference of track pin and link
- G. Fitting of master pin and link
- H. Clearence gap of link
- I. Master pin
- Slewing speed is slow.
- Replace seal for pump shaft.
- NO
- Medium speed
- OK
- Not reach max. speed
- Adjust engine speed
- OK
- 1. Diaphragm cover
- 2. Spring
- 3. Center plate
- 4 Diaphragm
- 5. Remove this side
- 6. Bonnet
- 7. Breather baffle
- 8. Breather pipe
- 9. Baffle plate
- 10. Plug
- 11. Suction manifold