Komatsu PC80MR-3 excavator pdf operation and maintenance manual
Format: PDF
Pages: 302
File size: 11.45 MB
Language: English
Models: PC80MR-3 SN F00003 and up
Table of Contents for KOMATSU-WEAM009700 manual
- 1.1 FOREWORD
- 1.2 INFORMATION ON SAFETY
- 1.3 INTRODUCTION
- 1.3.1 INTENDED USE OF THE MACHINE
- 1.3.2 IMPROPER OR UNAUTHORIZED USES
- 1.3.3 RUNNING-IN
- 1.3.4 POSITIONS AND DIRECTIONS OF THE MACHINE
- 1.4 PRODUCT IDENTIFICATION
- 1.4.1 MACHINE SERIAL NUMBER
- 1.4.2 MACHINE IDENTIFICATION PLATE AND PRODUCT IDENTIFICATION NUMBER (PIN)
- 1.4.3 ENGINE SERIAL NUMBER AND EXHAUST GAS EMISSION PLATE
- 1.4.4 TRAVEL REDUCTION GEAR SERIAL NUMBER
- 1.4.5 SWING REDUCTION GEAR SERIAL NUMBER
- 1.4.6 CAB SERIAL NUMBER
- 1.4.7 SERIAL NUMBERS AND DEALER'S ADDRESS
- 1.5 KOMTRAX SYSTEM
- 1.5.1 GENERAL PRECAUTIONS
- TABLE OF CONTENTS
- 2.1 SAFETY, NOISE AND VIBRATION PLATES
- 2.1.1 POSITION OF THE SAFETY PLATES
- 2.1.2 PICTOGRAMS AND RELEVANT MEANINGS
- 2.1.3 POSITION OF THE NOISE PLATES
- 2.1.4 VIBRATIONS TO WHICH THE OPERATOR IS SUBJECTED
- 2.2 GENERAL PRECAUTIONS
- 2.2.1 SAFETY RULES
- 2.2.2 HOW TO BEHAVE IN CASE OF ANOMALIES
- 2.2.3 CLOTHING AND PERSONAL PROTECTION ITEMS
- 2.2.4 FIRE EXTINGUISHERS AND FIRST AID KIT
- 2.2.5 SAFETY DEVICES AND GUARDS
- 2.2.6 CLEANING THE MACHINE
- 2.2.7 INSIDE OF THE CAB
- 2.2.8 LEAVING THE OPERATOR SEAT
- 2.2.9 GETTING ON AND OFF THE MACHINE
- 2.2.10 IT IS FORBIDDEN TO CLIMB ON THE EQUIPMENT
- 2.2.11 ARTICULATED PARTS
- 2.2.12 PREVENTING BURNS
- 2.2.13 PREVENTING FIRES DUE TO FUEL AND OIL
- 2.2.14 HOW TO BEHAVE IN CASE OF FIRE
- 2.2.15 DETERGENT FOR THE WINDOWS
- 2.2.16 PROTECTION AGAINST FALLING OBJECTS, FLYING OBJECTS, FOREIGN BODIES
- 2.2.17 PRECAUTIONS CONCERNING THE EQUIPMENT
- 2.2.18 COMBINING THE WORK EQUIPMENT
- 2.2.19 WORK LIGHT AND CAB LIGHTS
- 2.2.20 CAB WINDOWS
- 2.2.21 PRECAUTIONS CONCERNING THE CAB STRUCTURE
- 2.2.22 UNAUTHORIZED MODIFICATIONS
- 2.2.23 SAFETY AT THE WORKPLACE
- 2.2.24 WORKING ON LOOSE GROUND
- 2.2.25 PREVENTING ELECTROCUTION
- 2.2.26 VISIBILITY
- 2.2.27 ROOM VENTILATION
- 2.2.28 CHECKING THE SIGNALS OF THE SIGNALMAN AND THE FIXED SIGNS
- 2.2.29 HAND SIGNALS
- 2.2.30 EMERGENCY EXIT
- 2.2.31 PREVENTING DAMAGE DUE TO ASBESTOS POWDER
- 2.3 PRECAUTIONS FOR USE
- 2.3.1 BEFORE STARTING THE ENGINE
- 2.3.2 PRECAUTIONS TO BE TAKEN WHEN WORKING
- 2.3.3 TRANSPORTING THE MACHINE
- 2.3.4 BATTERY
- 2.3.5 REMOVAL
- 2.4 PRECAUTIONS FOR MAINTENANCE
- 2.4.1 WARNING PLATES
- 2.4.2 KEEP THE WORK PLACE CLEAN AND ORDERLY
- 2.4.3 APPOINT A SUPERVISOR WHEN WORKING WITH OTHER PEOPLE
- 2.4.4 STOP THE ENGINE BEFORE CARRYING OUT ANY MAINTENANCE OPERATION OR INSPECTION
- 2.4.5 MAINTENANCE OPERATIONS TO BE CARRIED OUT WITH THE ENGINE RUNNING REQUIRE THE PRESENCE OF TWO OPERATORS
- 2.4.6 TOOLS
- 2.4.7 HYDRAULIC ACCUMULATOR
- 2.4.8 MAINTENANCE STAFF
- 2.4.9 EQUIPMENT
- 2.4.10 WORKING UNDER THE MACHINE
- 2.4.11 NOISE
- 2.4.12 PRECAUTIONS TO BE TAKEN WHEN USING THE HAMMER
- 2.4.13 REPAIR WELDS
- 2.4.14 RULES TO BE FOLLOWED WHEN REFUELLING OR ADDING OIL
- 2.4.15 CHECKING THE COOLANT LEVEL IN THE RADIATOR
- 2.4.16 USING LAMPS
- 2.4.17 PRECAUTIONS TO BE TAKEN WHEN HANDLING THE BATTERY AND THE ALTERNATOR
- 2.4.18 PRECAUTIONS CONCERNING THE STARTER
- 2.4.19 PRECAUTIONS TO BE TAKEN WHEN USING HIGH-PRESSURE GREASE TO ADJUST THE TRACK TENSION
- 2.4.20 DO NOT REMOVE THE SHOCK ABSORBING SPRING FROM THE SHOCK ABSORBER UNIT
- 2.4.21 PRECAUTIONS TO BE TAKEN WHEN HANDLING HIGH-PRESSURE OIL
- 2.4.22 HANDLING HIGH-PRESSURE HOSES
- 2.4.23 PRECAUTIONS FOR MAINTENANCE OPERATIONS AT HIGH TEMPERATURES AND HIGH PRESSURE
- 2.4.24 COOLING FAN AND BELT
- 2.4.25 WASTE MATERIALS
- 2.4.26 SERVICING THE AIR CONDITIONER
- 2.4.27 COMPRESSED AIR
- 2.4.28 PERIODICAL CHANGE OF THE PARTS THAT ARE CRITICAL FOR SAFETY
- 2.4.29 PRECAUTIONS TO BE TAKEN WHEN HANDLING TECHNOPOLYMERS AND ELASTOMERS
- 2.4.30 PRECAUTIONS TO BE TAKEN WHEN USING SYNTHETIC BIODEGRADABLE OIL TYPE HEES
- 3.1 DESCRIPTION AND USE OF THE MACHINE
- 3.1.1 GENERAL VIEW OF THE MACHINE WITH MONOBOOM
- 3.1.2 GENERAL VIEW OF THE MACHINE WITH TWO-PIECE BOOM
- 3.1.3 CONTROLS AND INDICATORS
- 3.2 INSTRUMENTS AND CONTROLS
- 3.2.1 DASHBOARD
- 3.2.2 SWITCHES AND PUSH BUTTONS
- 3.2.3 CONTROL LEVERS AND PEDALS
- 3.2.4 CAB
- 3.2.5 COVERS WITH LOCK
- 3.2.6 ENGINE HOOD
- 3.2.7 TANK COVER
- 3.2.8 FUSES AND RELAY
- 3.2.9 CONTROLLER
- 3.2.10 VENTILATION AND HEATING
- 3.2.11 AIR CONDITIONER (if installed)
- 3.2.12 TECHNICAL DOCUMENTATION COMPARTMENT
- 3.2.13 TOOL BOX
- 3.2.14 GREASING PUMP SUPPORT
- 3.2.15 ASHTRAY
- 3.2.16 FIRE EXTINGUISHERS
- 3.2.17 FIRST AID KIT
- 3.3 USE OF THE MACHINE
- 3.3.1 CHECKS TO BE CARRIED OUT BEFORE STARTING THE ENGINE
- 3.3.2 DAILY CHECKS
- 3.3.3 ADJUSTMENTS
- 3.3.4 SEAT BELT
- 3.3.5 OPERATIONAL CHECKS
- 3.3.6 STARTING THE ENGINE
- 3.3.7 AFTER STARTING THE ENGINE
- 3.3.8 STOPPING THE ENGINE
- 3.3.9 CHECKS TO BE CARRIED OUT AFTER STOPPING THE ENGINE
- 3.3.10 OPERATING THE MACHINE
- 3.3.11 STEERING THE MACHINE
- 3.3.12 SWINGING THE TURRET
- 3.3.13 WORK EQUIPMENT CONTROLS AND FUNCTIONS
- 3.3.14 WORK MODE
- 3.3.15 UNAUTHORIZED OPERATIONS
- 3.3.16 IGENERAL INFORMATION ON THE OPERATION OF THE MACHINE
- 3.3.17 MOVING ON SLOPES
- 3.3.18 GETTING THE MACHINE OUT OF MUD
- 3.3.19 OPERATIONS THAT CAN BE PERFORMED WITH THE HYDRAULIC EXCAVATOR
- 3.3.20 CHANGING THE BUCKET
- 3.3.21 PARKING THE MACHINE
- 3.3.22 CHECKS TO BE CARRIED OUT ON THE MACHINE AT THE END OF THE WORK DAY
- 3.3.23 LOCKING THE MACHINE
- 3.3.24 ROAD LINERS AND RUBBER TRACKS
- 3.4 TRANSPORTING THE MACHINE
- 3.4.1 TRANSPORT PROCEDURE
- 3.4.2 LOADING AND UNLOADING THE MACHINE
- 3.4.3 HOW TO LIFT THE MACHINE
- 3.5 USING THE MACHINE IN COLD CLIMATES
- 3.5.1 PRECAUTIONS TO BE TAKEN WHEN USING THE MACHINE IN THE COLD SEASON
- 3.5.2 AT THE END OF THE WORK DAY
- 3.5.3 AT THE END OF THE COLD SEASON
- 3.6 LONG PERIODS OF INACTIVITY
- 3.6.1 BEFORE A PERIOD OF INACTIVITY
- 3.6.2 DURING A PERIOD OF INACTIVITY
- 3.6.3 AFTER A PERIOD OF INACTIVITY
- 3.7 TROUBLESHOOTING
- 3.7.1 IF FUEL RUNS OUT COMPLETELY
- 3.7.2 OCCURRENCES THAT ARE NOT FAILURES
- 3.7.3 REMOVING THE MACHINE
- 3.7.4 DEMANDING OPERATING CONDITIONS
- 3.7.5 IF THE BATTERY IS DOWN
- 3.7.6 REMOVING AND INSTALLING THE BATTERY
- 3.7.7 CHARGING THE BATTERY
- 3.7.8 STARTING WITH BOOSTER CABLES
- 3.7.9 LOWERING THE WORK EQUIPMENT WHEN THE ENGINE STOPS BECAUSE OF A FAILURE
- 3.7.10 OTHER TROUBLES
- 4.1 GUIDE TO MAINTENANCE
- 4.2 MAINTENANCE NOTES
- 4.2.1 OIL, FUEL AND COOLANT
- 4.2.2 NOTES ON THE MAINTENANCE OF THE ELECTRICAL SYSTEM
- 4.2.3 NOTES ON THE MAINTENANCE OF THE HYDRAULIC SYSTEM
- 4.2.4 MAINTENANCE NOTES REGARDING LUBRICATION
- 4.3 PARTS SUBJECT TO WEAR
- 4.3.1 LIST OF THE PARTS SUBJECT TO WEAR
- 4.4 FUEL, COOLANT AND LUBRICANTS
- 4.4.1 COOLANT
- 4.4.2 APPROVED SYNTHETIC BIODEGRADABLE LUBRICANTS TYPE HEES
- 4.5 TIGHTENING TORQUES
- 4.5.1 STANDARD TIGHTENING TORQUES FOR SCREWS AND NUTS
- 4.5.2 STANDARD TIGHTENING TORQUES FOR HOSES WITH ORFS
- 4.6 LUBRICATION
- 4.6.1 LUBRICATION DIAGRAM
- 4.7 PERIODICAL CHANGE OF SAFETY-RELATED COMPONENTS
- 4.7.1 SAFETY-RELATED PARTS
- 4.8 MAINTENANCE PLAN
- 4.8.1 MAINTENANCE PLAN
- 4.8.2 MAINTENANCE INTERVALS IN CASE OF USE OF THE HYDRAULIC BREAKER
- 4.9 MAINTENANCE PROCEDURES
- 4.9.1 WHEN REQUIRED
- 4.9.2 CHECKS TO BE CARRIED OUT BEFORE STARTING THE ENGINE
- 4.9.3 MAINTENANCE AFTER THE FIRST 50 HOURS OF OPERATION (Only for machines in which synthetic biodegradable oil type HEES is used)
- 4.9.4 MAINTENANCE EVERY 50 HOURS OF OPERATION
- 4.9.5 MAINTENANCE EVERY 100 HOURS OF OPERATION
- 4.9.6 MAINTENANCE AFTER THE FIRST 250 HOURS OF OPERATION
- 4.9.7 MAINTENANCE EVERY 250 HOURS OF OPERATION
- 4.9.8 MAINTENANCE AFTER THE FIRST 500 HOURS OF OPERATION (Only for machines in which synthetic biodegradable oil type HEES is used)
- 4.9.9 MAINTENANCE EVERY 500 HOURS OF OPERATION
- 4.9.10 MAINTENANCE EVERY 1000 HOURS OF OPERATION
- 4.9.11 MAINTENANCE EVERY 2000 HOURS OF OPERATION
- 4.9.12 MAINTENANCE EVERY 4000 HOURS OF OPERATION
- 4.9.13 MAINTENANCE EVERY 5000 HOURS OF OPERATION
- 5.1 TECHNICAL DATA
- 5.2 LIFTING CAPACITIES
- 5.2.1 LIFTING CAPACITIES WITH MONOBOOM
- 6.1 AUTHORIZED OPTIONAL EQUIPMENT
- 6.1.1 PRECAUTIONS REGARDING SAFETY
- 6.1.2 PRECAUTIONS REGARDING THE INSTALLATION OF EQUIPMENT
- 6.1.3 AUTHORISED TOOLS CHARACTERISTICS
- 6.2 ARRANGEMENT FOR THE INSTALLATION OF THE DEMOLITION HAMMER
- 6.2.1 DESCRIPTION AND CONTROL
- 6.2.2 USE OF THE DEMOLITION HAMMER AND RULES TO BE OBSERVED
- 6.2.3 INSTALLING AND REMOVING THE DEMOLITION HAMMER
- 6.2.4 MAINTENANCE
- 6.3 ARRANGEMENT FOR THE INSTALLATION OF THE CLAMSHELL BUCKET SWING SYSTEM (second hydraulic line)
- 6.4 ARRANGEMENT FOR THE INSTALLATION OF THE BUCKET QUICK COUPLING SYSTEM (Third hydraulic line)
- 6.5 INSTALLING AND REMOVING THE ADDITIONAL COUNTERWEIGHT
An Operation & Maintenance Manual is the essential guide for every machine operator and owner. It provides the fundamental knowledge required to keep your equipment running safely and efficiently. Unlike technical repair books, this manual focuses on preventive maintenance and correct daily usage.
Key topics covered in this manual:
-
Safety Precautions: Critical guidelines for protecting the operator and the machine.
-
Operating Instructions: Detailed breakdown of controls, instruments, and handling techniques.
-
Maintenance Intervals: A complete schedule for oil changes, filter replacements, and lubrication points.
-
Capacities & Specifications: Exact data on fuel, hydraulic fluids, and coolant requirements.
Following the official Operation & Maintenance Manual is the best way to maximize the lifespan of your equipment, ensure warranty compliance, and maintain a high resale value.