English
Komatsu PC30R-8, PC35R-8, PC40R-8, PC45R-8 midi excavator pdf shop manual
KOMATSU-SEBD012604
$25.90
No tax
Format: PDF
Pages: 588
File size: 21.72 MB
Language: English
Models: PC30R-8 10001 and up, PC35R-8 35001 and up, PC40R-8 30001 and up, PC45R-8 5001 and up
Create an account and join to our cumulative discounts program. Spend at least $29.9 and get 10.00% discount.
Rating:
(0)
Table of Contents for KOMATSU-SEBD012604 manual
- MAIN MENU
- COVER
- CONTENTS
- 00 FOREWARD
- SAFETY
- FOREWARD
- HOW TO READ THE SHOP MANUAL
- HOISTING INSTRUCTIONS
- METHOD OF DISASSEMBLING, CONNECTING PUSH-PULL TYPE COUPLER
- COATING MATERIALS
- STANDARD TIGHTENING TORQUE
- ELECTRIC WIRE CODE
- CONVERSION TABLE
- UNITS
- 01 GENERAL
- GENERAL ASSEMBLY DRAWING
- SPECIFICATIONS
- WEIGHT TABLE
- LIST OF LUBRICANT AND WATER
- 10 STRUCTURE AND FUNCTION
- PTO (COUPLING)
- RADIATOR, OIL COOLER
- ENGINE CONTROL
- POWER TRAIN
- SWING CIRCLE
- SWING MACHINERY
- TRACK FRAME, RECOIL SPRING
- HYDRAULIC PIPING
- HYDRAULIC CIRCUIT DIAGRAM
- HYDRAULIC PUMP
- CENTER SWIVEL JOINT
- SWING MOTOR
- TRAVEL MOTOR
- 9-SPOOL CONTROL VALVE
- CLSS
- MULTI-CONTROL VALVE
- ELECTRICAL WIRING DIAGRAM
- VALVE CONTROL
- WORK EQUIPMENT, SWING PPC VALVE
- SOLENOID VALVE
- WORK EQUIPMENT
- MACHINE MONITOR SYSTEM
- ELECTRICAL CIRCUIT DIAGRAM
- HYDRAULIC CYLINDER
- 20 TESTING AND ADJUSTING
- STANDARD VALUE TABLE
- TESTING AND ADJUSTING
- TROUBLESHOOTING
- 30 DISASSEMBLY AND ASSEMBLY
- METHOD OF USING MANUAL
- PRECAUTIONS WHEN CARRYING OUT OPERATION
- SPECIAL TOOL LIST
- SKETCHES OF SPECIAL TOOLS
- STARTING MOTOR (REMOVAL, INSTALLATION)
- ALTERNATOR (REMOVAL, INSTALLATION)
- FUEL INJECTION PUMP (REMOVAL)
- FUEL INJECTION PUMP (INSTALLATION)
- NOZZEL HOLDER (REMOVAL, INSTALLATION)
- WATER PUMP (REMOVAL)
- WATER PUMP (INSTALLATION)
- THERMOSTAT (REMOVAL, INSTALLATION)
- ENGINE FRONT SEAL (REMOVAL, INSTALLATION)
- ENGINE REAR SEAL (REMOVAL)
- ENGINE REAR SEAL (INSTALLATION)
- CYLINDER HEAD (REMOVAL)
- CYLINDER HEAD (INSTALLATION)
- RADIATOR, HYDRAULIC COOLER (REMOVAL
- RADIATOR, HYDRAULIC COOLER (INSTALLATION)
- ENGINE, HYDRAULIC PUMP (REMOVAL)
- ENGINE, HYDRAULIC PUMP (INSTALLATION)
- FUEL TANK (REMOVAL, INSTALLATION)
- DAMPER (REMOVAL, INSTALLATION)
- CENTER SWIVEL JOINT (REMOVAL, INSTALLATION)
- CENTER SWIVEL JOINT (DISASSEMBLY, ASSEMBLY)
- TRAVEL MOTOR (REMOVAL, INSTALLATION)
- PHV-300 (FOR PC30R-8) DISASSEMBLY AND ASSEMBLY OF TRAVEL MOTOR
- PHV-350 (FOR PC35R-8) DISASSEMBLY AND ASSEMBLY OF TRAVEL MOTOR
- PHV-500 (FOR PC40R-8) DISASSEMBLY AND ASSEMBLY OF TRAVEL MOTOR
- GM06VL (FOR PC45R-8) DISASSEMBLY AND ASSEMBLY OF TRAVEL MOTOR
- SPROCKET (REMOVAL, INSTALLATION)
- SWING MOTOR, SWING MACHINERY (REMOVAL)
- SWING MOTOR, SWING MACHINERY (INSTALLATION)
- SWING MOTOR, SWING MACHINERY (DISASSEMBLY)
- SWING MOTOR, SWING MACHINERY (ASSEMBLY)
- DISASSEMBLY SWING MOTOR ASSEMBLY LMF 16AB
- ASSEMBLY SWING MOTOR ASSEMBLY LMF 16AB
- REVOLVING FRAME (REMOVAL)
- REVOLVING FRAME (INSTALLATION)
- SWING CIRCLE (REMOVAL, INSTALLATION)
- IDLER (REMOVAL, INSTALLATION)
- IDLER (DISASSEMBLY)
- IDLER (ASSEMBLY)
- RECOIL SPRING (REMOVAL, INSTALLATION)
- RECOIL SPRING (DISASSEMBLY)
- RECOIL SPRING (ASSEMBLY)
- TRACK ROLLER (REMOVAL, INSTALLATION)
- TRACK ROLLER (DISASSEMBLY)
- TRACK ROLLER (ASSEMBLY)
- CARRIER ROLLER (REMOVAL, INSTALLATON)
- CARRIER ROLLER (DISASSEMBLY, ASSEMBLY)
- RUBBER SHOE (REMOVAL, INSTALLATION)
- STEEL SHOE (REMOVAL, INSTALLATION)
- HYDRAULIC TANK (REMOVAL, INSTALLATION)
- HYDRAULIC COOLER (REMOVAL, INSTALLATION)
- HYDRAULIC PUMP (REMOVAL, INSTALLATION)
- DISASSEMBLY OF MAIN PUMP ASSEMBLY (LPV 45)
- ASSEMBLY OF MAIN PUMP ASSEMBLY (LPV 45)
- CONTROL VALVE (REMOVAL)
- CONTROL VALVE (INSTALLATION)
- CONTROL VALVE (DISASSEMBLY)
- CONTROL VALVE (ASSEMBLY)
- 2-SPOOL SOLENOID VALVE (REMOVAL, INSTALLATION)
- LEFT PPC VALVE (REMOVAL, INSTALLATION)
- RIGHT PPC VALVE (REMOVAL, INSTALLATION)
- PPC VALVE (DISASSEMBLY)
- PPC VALVE (ASSEMBLY)
- BOOM CYLINDER (REMOVAL)
- BOOM CYLINDER (INSTALLATION)
- ARM CYLINDER (REMOVAL)
- ARM CYLINDER (INSTALLATION)
- BUCKET CYLINDER (REMOVAL)
- BUCKET CYLINDER (INSTALLATION)
- BOOM SWING CYLINDER (REMOVAL)
- BOOM SWING CYLINDER (INSTALLATION)
- BLADE CYLINDER (REMOVAL)
- BLADE CYLINDER (INSTALLATION)
- HYDRAULIC CYLINDER (DISASSEMBLY)
- HYDRAULIC CYLINDER (ASSEMBLY)
- WORK EQUIPMENT (REMOVAL)
- WORK EQUIPMENT (INSTALLATION)
- BUCKET (REMOVAL, INSTALLATION)
- ARM (REMOVAL)
- ARM (INSTALLATION)
- BUCKET, ARM (REMOVAL)
- BUCKET, ARM (INSTALLATION)
- BOOM (REMOVAL)
- BOOM (INSTALLATION)
- BOOM SWING BRACKET (REMOVAL)
- BOOM SWING BRACKET (INSTALLATION)
- BLADE (REMOVAL)
- BLADE (INSTALLATION)
- OPERATOR'S CAB (REMOVAL, INSTALLATION)
- CANOPY (REMOVAL, INSTALLATION)
- FLOOR FRAME (REMOVAL, INSTALLATION)
- 40 MAINTENANCE STANDARD
- SWING CIRCLE
- SWING MACHINERY
- SPROCKET
- TRACK FRAME, RECOIL SPRING
- IDLER
- TRACK ROLLER
- CARRIER ROLLER
- TRACK SHOE
- CENTER SWIVEL JOINT
- HYDRAULIC PUMP
- WORK EQUIPMENT, SWING PPC VALVE
- SWING MOTOR
- 9-SPOOL CONTROL VALVE
- HYDRAULIC CYLINDER
- WORK EQUIPMENT
- 90 OTHER
- HYDRAULIC CIRCUIT DIAGRAM PC30R-8
- HYDRAULIC CIRCUIT DIAGRAM PC35R-8
- HYDRAULIC CIRCUIT DIAGRAM PC40R-8
- HYDRAULIC CIRCUIT DIAGRAM PC45R-8
- ELECTRICAL CIRCUIT DIAGRAM
- HYDRAULIC PIPING DRAWING
- SYSTEM DIAGRAM DRAWING